LNWR REPAIRS
21st MARCH 2011
44422 waiting at Crewe for the arrival of the vehicle to transport it to The Nene Valley Railway.
21/03/2011
LNWR(H) diesel arrived to give the 4F a shove towards the low loader.
21/03/2011
Hooked up.
21/03/2011
Note the connecting rods as the centre wheels drop.
21/03/2011
Made it.
21/03/2011
Leaving the Heritage Centre with Crewe Station in the background.
21/03/2011
The blower ring that was replaced during the overhaul.
21/03/2011
Note the repairs and the erosion damage.
21/03/2011
Black Prince was on site receiving attention.
21/03/2011
It's amazing what you see at Crewe.
21/03/2011
Home
Top