LNWR
11th JULY 2007
44422 being prepared for transfer to The West Somerset Railway.
11/07/2007
The safety valves were receiving attention.
11/07/2007
Simmering.
11/07/2007
Once pressure was established the engine was tested under load by connecting it to the site's 50 tonne capacity crane unit.
11/07/2007
Put to bed ready for the move South.
11/07/2007
Home
Top